Building log

19-Aug-2010
Flaps
Catégorie: Finishing : Wiring

Today I worked on the flaps wiring.
It's a bit complicated by the fact that I use a flaps positionning system.
But first things first, I test the system with the flaps positionning system disabled, as I would do in case of malfunction of the system.
I then reconfigure the wiring to use the flaps positionning system. As it needs the flaps position I install and wire the position sensor.



I then test and program the system. It's not without some little snags due to the fact that the CPU has only a single programming button and a LED. But after a few tries, I manage to get some satisfactory results and can test the whole system.



The flaps position is also transmitted through the EIS to the EFISes. After some tweaking the EFIS shows a bargraph with the flaps position. Here they are approximately one third down.




Working time on this subpart
Today :  4h (Total : 174h)