Building log |
![]() |
31-Aug-2010
Lacing anf D-sub shells
|
Still working on the wiring by installing the clamps on the left side. I first have to take outthe EFIS to be get acces to rivet the nutplates. The D-sub connectors get their shells installed, this is the left EFIS. When the D-sub connector is in line, I join them by using two zip ties. I then use some adhesive velcro to mount them on a flat surface. Working time on this subpart Today : 3h (Total : 184h) |
Lectures (2381)