Building log

31-Aug-2010
Lacing anf D-sub shells
Catégorie: Finishing : Wiring

Still working on the wiring by installing the clamps on the left side. I first have to take outthe EFIS to be get acces to rivet the nutplates.



The D-sub connectors get their shells installed, this is the left EFIS.



When the D-sub connector is in line, I join them by using two zip ties. I then use some adhesive velcro to mount them on a flat surface.




Working time on this subpart
Today :  3h (Total : 184h)

Lectures (2381)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami