Building log |
11-Jul-2006
First assembly
|
Today I deburred all the parts, then I assembled the left aileron to drill everything. On the picture you can see the spar, the leading edge and inside the leading edge the couterweight pipe. This pipe is fixed with pop rivets, I'll have to look how to use this particular type of rivets at this location. Working time on this subpart Today : 2h (Total : 7h) |
Lectures (2703)