Building log |
![]() |
06-Sep-2010
Stick wiring
|
The aim was to finish the wiring of the terminal strip at the bottom of the sticks. But first I had to make sure all the wires and tubing going through the main frame were in place. There was not enough room for the AOA pressure tubings, so I drilled a new hole albeit not documented by Vans, many builders do this. I choose a spot were there would be no interference with other holes or structural elements. There are also two more wires running from the microphone plug to the PTT on the stick. And finally, all the wires are secured at the terminal strip. Working time on this subpart Today : 2h (Total : 188h) |