Building log

11-Sep-2010
Intrados...V
Catégorie: Wings : Final assembly

Gaà«l, future RV-9A builder gave me a hand setting the remaining rivets on the bottom of the right wing. After some training we finished in no time alternating the use of the gun, the bucking bar and the squeezer.



We also installed the OAT probe.




Working time on this subpart
Today :  2h (Total : 80h)

Lectures (3038)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami