Building log

20-Nov-2010
Access panels.. the end
Catégorie: Fuselage : Forward fuselage

As the primer was dry, it was riveting time. A lot of rivets, including twelve platenuts for each panel.



I then sealed the panels by using proseal that once dry should avoid water entering fuselage. The panels are protected by a release tape.




Working time on this subpart
Today :  3h (Total : 96h)