As the primer was dry, it was riveting time. A lot of rivets, including twelve platenuts for each panel.
I then sealed the panels by using proseal that once dry should avoid water entering fuselage. The panels are protected by a release tape.
Working time on this subpart
Today : 3h (Total : 96h)