Building log

24-Nov-2010
Engine controls
Catégorie: Empennage

There are still a few items to install on the panel, among them the engine controls.
From left to right : the throttle, the mixture and the alternate air.
The other ends have been secured on the engine side.



The cables have to be secured via clamps to the subpanel. Easier said than done as drilling and riveting behind the panel is all but easy.
The picture shows the three clamps for the three cables.




Working time on this subpart
Today :  3h (Total : 115h)

Lectures (3035)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami