Building log

02-Nov-2011
Final inspection
Catégorie: Assembly

This mornings all the parts I have assembled for the last five and a half year officially became an airplane after inspection by the authorities.
First the inspector checked the paperwork ; weight and balance, maintance schedule, engine, propeller and radio release papers. He then inspected the airframe, found a missing screw on a wing root fairing and two caps that need to be safetywired on the engine.
He finally declared the we have a plane.
First flight will be planned once I get the release papers from the authorities, usually takes between one and two weeks.