Articles
Other informations
Galeries
All the pictures
Building log
From metal to plane
In flight
Taking wings
Home
Building log
16-Aug-2006
Problems
Catégorie:
Wings
:
Main spar
Today I have redone the parts that were misdrilled last week, I'm still not satisfied with the new parts. I'll make complete new ones: spacer and tie-down support.
Working time on this subpart
Today : 1h (Total : 11h)
Lectures (3806)
Précédent
|
Suivant
Status (30 apr 2012)
Time :
2270
hours
In progress
Done
To come
Subparts
Miscellaneous
(14)
Workshop
(11)
Tools
(1)
Empennage
(6)
Hor. stab.
(15)
Vertical stab.
(8)
Rudder
(8)
Elevator
(15)
Tip
(38)
Wings
(7)
Flaps
(7)
Ailerons
(13)
Main spar
(8)
Ribs
(7)
Rear spar
(3)
Skeleton
(14)
Skins
(10)
Leading edge
(20)
Fuel tanks
(40)
Final assembly
(31)
Wingtips
(14)
Fuselage
(5)
Bulkheads
(28)
Rear part
(29)
Center part
(21)
Longeron
(6)
Forward fuselage
(36)
Cabin
(111)
Upper fuselage
(13)
Finishing
(6)
Wiring
(100)
Canopy
(71)
Landing gear
(45)
Engine
(7)
Firewall forward
(81)
Cowls
(52)
Propeller
(13)
Panel
(43)
Assembly
(48)
Main menu
Accueil
Flying
Building log
Archives
Photo album
Articles
Search
Recherche avancée