Building log

27-Nov-2006
Cleaning
Catégorie: Wings : Fuel tanks

A good part of the working session was used to clean all the clecos. After having bathed them all the night in some thinner, I rub them thorougly and finish the sticky parts with a brush mounted in my drillpress.
I also prepared the left tank for the leak test I'll begin at the end of the week.




Working time on this subpart
Today :  3h (Total : 87h)
Lectures (2782)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami