Building log

23-Dec-2006
The wing cradle
Catégorie: Wings : Final assembly

The day begins with the building of the wing storing cradle. I did follow exactly Vans plan as I have to build the cradle as small as possible due to lack of storing space. I forgot to take a picture before transfering the wings from the jig. Here is the result.







The I disassembled the construction jig and cleaned up the workshop. I couldn't resist trying to install the ailerons. It begins with the fabrication of some spacers from aluminium tubing., and the the aileron gets installed on the wings trailing adge.



Here is one of the brackets, still some washers to install, this looks like some challenge. I also think that I should not have cut the spacers per plan, but have waited till the aileron is on the wing to get the correct diemensions. I'll do the when rigging the ailerons for the final time.




Working time on this subpart
Today :  5h (Total : 30h)