Building log

13-Apr-2007
Firewall
Catégorie: Fuselage : Bulkheads

Firewall riveting, this took quite longer than expected. The task is not that difficult but the firewall is a bit bulky and needs to be well secured during the riveting. In the end I'm satisfied with the result.






The firewall recess will only be riveted later as it allows access to the inner part of the firewall.
Working time on this subpart
Today :  3h (Total : 61h)

Lectures (3337)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami