Building log

29-May-2007
Assembly..again
Catégorie: Fuselage : Center part

Due to Veterans' Day, no answer from Vans about my problem with the seat ribs. I decide however to go on and continue the assembly of the center fuselage. First I rivet all the nutplates on the seat ribs, then I assemble the small doors on the four inner ribs, they will allow easy installation of the controls.



Then I bolt on the seat belt brackets on the seat bulkhead.



I then begin riveting the baggage ribs to the seat bulkhead, some rivets are a bit akward to set as access is not always easy. I still have to rivets the two problem ribs to that bulkhead pending Vans answer.




Working time on this subpart
Today :  3h (Total : 32h)

Lectures (2599)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami