Building log

18-Jun-2007
Miscellaneous
Catégorie: Wings : Leading edge

First I finish the installation of the AoA. I wanted a system to guide the drain stick. For this I use a nylon tube, inside I prosealead 2" of delrin rod with a hole in the center. The whole thing is then screwed to the lower skin via a delrin base. All the parts are now screwed on and the sealing done with proseal. Here is the picture of the installation.



Then I tackled the right wing landing light, as it's the seconf light installation it went smoothly.
I then dismounted the left fuel tank, I have to prime the exterior and wire the gauge.




Working time on this subpart
Today :  5h (Total : 37h)

Lectures (3354)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami