Building log |
![]() |
19-Jun-2007
Small works
Catégorie: Wings : Leading edge
|
During the wing construction I had noticed a small gap between the fuel tanks and the leading edge. A both tanks are now off the spar I tackled this small problem by insterting a small shim after having drilled out one rivet. We'll see how it looks after the tanks are reinstalled. Working time on this subpart Today : 2h (Total : 39h) |
Lectures (3559)