Building log

19-Jun-2007
Small works
Catégorie: Wings : Leading edge

During the wing construction I had noticed a small gap between the fuel tanks and the leading edge. A both tanks are now off the spar I tackled this small problem by insterting a small shim after having drilled out one rivet. We'll see how it looks after the tanks are reinstalled.




Working time on this subpart
Today :  2h (Total : 39h)

Lectures (3336)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami