Building log

26-Jul-2007
Drilling
Catégorie: Fuselage : Forward fuselage

I did all the drillings in the forward fuselage : the rear to center fuse junction, the skin to bulheads holes and the outer rib holes (visible on the picture with all the copper clecos).



Then I drilled the armrest (a picture from inside).



I could not resist trying to position the firewall. The drilling of that part will be next.




Working time on this subpart
Today :  2h (Total : 6h)

Lectures (2422)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami