Building log

29-Sep-2007
Aft deck
Catégorie: Fuselage : Upper fuselage

Today I tackled the aft deck installation. First I fabricated the two spacers that have to be inserted between the bulkheads and the deck. On the picture look for the shiny non primed parts/



Before drilling I checked that the fuselage was twist free.



After the drilling, I riveted the skins to the longeron where the aft deck will meet the longeron. Those rivets would be difficult to set once the deck is in place.



I also riveted part of the forward side skin to the longeron where the canopy deck will be positionned.




Working time on this subpart
Today :  3h (Total : 5h)

Lectures (2568)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami