Building log

23-Oct-2007
Reassembly
Catégorie: Fuselage : Cabin

Today some parts got reassembled, first the elevator bellcrank.



Then I reinstalled the bagage bulkhead, the cabin floors after some vacuuming. The sticks were another story, I forst had to prime one of the pushrods, then adjust it correctly, bolt on the support angles on the main bulkhead.
I still have to bolt everything to the supports angles.




Working time on this subpart
Today :  3h (Total : 28h)

Lectures (2328)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami