Building log

14-Feb-2008
Small parts
Catégorie: Fuselage : Rear part

As I'll soon begin the installation of the empennage, I decided to fabricate a few small parts that will be needed: two shims and the elevator stop.



Before drilling the elevator stop I put it into position on the fuselage, to make sure I will be drilling without compromising the edge distances on the fuselage longerons.




Working time on this subpart
Today :  1h (Total : 52h)

Lectures (2408)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami