Building log

01-Dec-2008
Systems installation
Catégorie: Fuselage : Rear part

I first installed the strobe control box.



Then I installed the autopilot pitch servo. I needed to play with some washers to get enough clearance from the structure for all the parts.
Installing the safety wire was not very easy, I'll see next time if it's not better to redo it.




Working time on this subpart
Today :  1h (Total : 75h)

Lectures (3128)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami