02-Dec-2008
Safety wire
Catégorie:
Fuselage
:
Rear part
Only one hour in the workshop to redo the safety wire on the pitch servo control. First I put some blue Loctite on the bolts and then I use a smaller gage wire which proved easier to install.
Working time on this subpart
Today : 1h (Total : 76h)
Lectures (3152)
Précédent
|
Suivant
Status (30 apr 2012)
Time :
2270
hours
In progress
Done
To come
Subparts
Miscellaneous
(14)
Workshop
(11)
Tools
(1)
Empennage
(6)
Hor. stab.
(15)
Vertical stab.
(8)
Rudder
(8)
Elevator
(15)
Tip
(38)
Wings
(7)
Flaps
(7)
Ailerons
(13)
Main spar
(8)
Ribs
(7)
Rear spar
(3)
Skeleton
(14)
Skins
(10)
Leading edge
(20)
Fuel tanks
(40)
Final assembly
(31)
Wingtips
(14)
Fuselage
(5)
Bulkheads
(28)
Rear part
(29)
Center part
(21)
Longeron
(6)
Forward fuselage
(36)
Cabin
(111)
Upper fuselage
(13)
Finishing
(6)
Wiring
(100)
Canopy
(71)
Landing gear
(45)
Engine
(7)
Firewall forward
(81)
Cowls
(52)
Propeller
(13)
Panel
(43)
Assembly
(48)
Main menu
Accueil
Flying
Building log
Archives
Photo album
Articles
Search
Recherche avancée