Building log |
![]() |
06-Feb-2009
End of work..for now
Catégorie: Finishing : Landing gear
|
Before putting the fairings back into storage for the time being (it's too cold to work with epoxy), I finish the tyre opening on the right fairing and install another nutplate which would have been difficult to do before the lower intersctions fairings were positionned. The small upper tabs on the gear leg fairings look a bit too flimsy for my liking. Vans suggests to epoxy a few layers of fiberglass, but I decided to sandwich a small aluminium tab that will help spread the load. Working time on this subpart Today : 1h (Total : 46h) |
Lectures (2312)