Building log

16-Jun-2006
Left elevator
Catégorie: Empennage : Elevator

This morning I assembled partially the left elevator skeleton and the trim tab. Then as I was still missing some parts I planned to begin looking at the wings, but in the afternoon the replacement parts arrived. So they were fitted, drilled, dimpled and primed.(It goes quite fast the second time)



As the paint dries rapidly, the skeleton was finished and the skin clecoed. Tomorrow I'll rivet the skin and maybe roll the leading edges.




Working time on this subpart
Today :  5h (Total : 40h)

Lectures (3461)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami