Building log |
![]() |
09-Jul-2009
Filling
|
I first rivet the nutplates for the upper nose gear leg fairing. Then I fill all the small defects I have found on the cowls. I also make a shim with epoxy between the forward support bracket and the part that will close the cowls. I think it's easier this way than fabricating aluminium shims. I think that after some sanding, the cowls will be ready for priming. Working time on this subpart Today : 2h (Total : 132h) |
Lectures (2347)