Building log

22-Jun-2006
Assembly with horizontal stab
Catégorie: Empennage : Elevator

Today I assembled the elevator and the horizontal stab. This needs some tweaks as the skins and the rear spar have to be grinded (as per plans) to allow full flight control travel.



Then the control horns are to be match drilled so they can be bolted together via the center bearing. This went quite well.



TO finish the empennage the composite wingtips need to be adjusted and the trim servo motor fine tuned.

Working time on this subpart
Today :  3h (Total : 48h)