Building log

11-Dec-2009
Plumbing..take2
Catégorie: Fuselage : Cabin

I fabricated the tubing I was having problems with yesterday. In fact there was a third routing possible. The tubing goes in front of the fuel flow sensor(red cube) and then under the pump bracket on the right side.
I also installed the antenna doublers.




Working time on this subpart
Today :  2h (Total : 215h)

Lectures (2485)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami