Building log

16-Dec-2009
Antenna doublers
Catégorie: Finishing : Wiring

Despite the very cold very we installed the antenna doublers. Sabine did a great job with the rivet gun and it took no time to set all the rivets.




Working time on this subpart
Today :  1h (Total : 26h)

Lectures (2341)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami