Building log

24-Aug-2010
Push-pull cables
Catégorie: Fuselage : Cabin

To finish the instrument panel, I have to install the cables activating the parking brake and the cabin-heat valve.
I begin by the latter. The cable goes along the right side, then down the firewall before reaching the valve.
I install two c-clamps and drill one of the firewall reinforcing angles to allow the passage of the cable. This is a view af the right side.



And this is cable at the valve.



For the parking brake, the routing is along the left side.



And this is how the cable reaches the parking brake valve.




Working time on this subpart
Today :  3h (Total : 240h)