Building log

15-Sep-2011
Cleaning
Catégorie: Assembly

I first tried to install the wing root fairing and succeeded, but the seal does not look that good, I think the gap with the fuselage is too wide. I will install new fairings later.



I then installed the fuel lines in the cabin for good.
I also cleaned the floors and installed the noise reduction mats. I still have some small items to finish before installing the underseat floors.




Working time on this subpart
Today :  4h (Total : 74h)

Lectures (2651)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami