25-Sep-2011
Preparing weighing
Catégorie: Assembly

Today I was not supposed to go to the hangar, but Guillaume needed some place to shoot a video. I began preparing for weighing.
I first redid the small connectors for the rudder pedals.



I then installed the interior, the pieces just have to be near their final place.



I also installed a quick drain for the engine oil, as oil is included in the mepty weight



I also calibrated the oil dipstick by making small marks with a tube cutter, I will mark the later.




Working time on this subpart
Today :  4h (Total : 84h)