Building log - Articles les plus récents |
![]() |
Tout : Finishing : Wiring |
17-Jun-2010
|
Still working on the routing af all the wires. On the right side, I begin by sleeving the wome wires in th engine compartment. I then tackle the wiring on the right side. There are also some sidetasks : wire markings, some crips to do... The forrest of tabs fills slowly. Working time on this subpart Today : 3h (Total : 122h) |
Lectures (2466)
16-Jun-2010
|
To be able to connect all the boxes and parts, I need to know how the wires will be routed to be sure they are not too short. So I installed semi permanently some of the harnesses. The left side looks good, but some wires are still missing. The center needs some more work. Working time on this subpart Today : 3h (Total : 119h) |
Lectures (2450)
14-Jun-2010
|
Today, I reinstalled the VFH and the trnasponder in the panel. Tomorrow I will install the headset plugs. I will then have almost all the wires in the cabin and be able to tackle the routing and the connexions. Working time on this subpart Today : 2h (Total : 116h) |
Lectures (2527)
08-Jun-2010
|
Before beginning soldering the headset plugs, I first finish the transponder harness. The altitude encoder DSUB gets installed as well as the markings of all the wires. Fifteen more wires finished. I then begin soldering the plugs. One has to be careful to which pin is used, how many wires there ar to solder , not forgetting the heatshrink. This are all the wires. Working time on this subpart Today : 4h (Total : 114h) |
Lectures (2509)
07-Jun-2010
|
No pictures today but I cut and marked th wires for the intercom and there are quite a few. Next task will be to solder the wires to the plugs. Working time on this subpart Today : 3h (Total : 114h) |
Lectures (2545)