10-Mar-2010
Catégorie: Panel

I received today some parts I needed to install the panel and continue the wiring.
I only had time to install two terminal strips and install the two camlocks on the fuse block support bracket.
The wiring book is coming slowly to its final definition, it will be uploaded to the website in a few days.


Working time on this subpart
Today :  1h (Total : 103h)

Lectures (2368)
03-Mar-2010
Catégorie: Panel

It's now time to begin the assembly of the panel elements. I begin by installing the GPS antennas.



Both antenna cables have to penetrate the firewall but one connector being very big I don't want to drill a hole this side. I will use a split grommet and have the wires go through a hole at the top of the firewall.



This is how it looks ont the firewall.



And this is the stainless steel shield I made that will be screwed on later.



I installed a few items on the subpanel.



And then I bolted the fuseblock on the hinged panel.




Working time on this subpart
Today :  3h (Total : 102h)

Lectures (2445)
01-Mar-2010
Catégorie: Panel

The panel and all the smaller parts have been painted the same grey as the cabin. It seems the result is not too bad, we'll see after the paint is dry.




Working time on this subpart
Today :  1h (Total : 99h)

Lectures (2497)
23-Feb-2010
Catégorie: Panel

Today I first painted the hidden parts of the panel support. The result is not perfect (the paint was a tad too thin) but nobody is supposed to check the back of the panel.




Working time on this subpart
Today :  2h (Total : 98h)

Lectures (2486)
22-Feb-2010
Catégorie: Panel

There was a little sunshien today, so I primed all the parts that have been waiting.




Working time on this subpart
Today :  2h (Total : 96h)

Lectures (2392)

« 1 2 (3) 4 5 6 ... 9 »