Building log - Articles les plus récents

Tout : Finishing : Wiring
« 1 ... 6 7 8 (9) 10 11 12 ... 20 »


03-Aug-2010
Catégorie: Finishing : Wiring

I forst install the autopilot harness behind the panel.
As almost all the wires are installed, I try to tidy up the harnesses. It would be easier if I had some knitting experience. This is a picture of the front of the subpanel, and it looks much cleaner than one hour before.



Some wires are not connected for the time being, the picture shows most of the wires going to the fuse blocks.



I finish today's work session by lacing the switches' wires. I try to leave enough slack to be able to unplug the wire but not too much to avoid them getting broken through vibrations.




Working time on this subpart
Today :  3h (Total : 143h)

Lectures (2237)
02-Aug-2010
Catégorie: Finishing : Wiring

I almost finished wiring the switches. I then completed the wiring of the flaps potionning module. Some markins had to be redone wiche always takes some time.
For the pane, I have the autopilot connectore to install and the intercom to wire, then I will try to tidy up all the wiring.




Working time on this subpart
Today :  3h (Total : 140h)

Lectures (2287)
31-Jul-2010
Catégorie: Finishing : Wiring

Still working on the switches wirings

Working time on this subpart
Today :  1h (Total : 137h)

Lectures (2066)
24-Jul-2010
Catégorie: Finishing : Wiring

Now that the switch panel is in place I begin wiring them. There are some terminals to crimp, some wires to fabricate and the routings to do.




Working time on this subpart
Today :  2h (Total : 136h)

Lectures (2208)
19-Jul-2010
Catégorie: Finishing : Wiring

I finished wiring the D-subs on the panel. I still have to wire all the switches.



Before doing that, I drilled the holes in the subpanel for the wires from the EIS going to the terminal strip. The bigger hole on the left is for all the intercom wires.




Working time on this subpart
Today :  2h (Total : 134h)

Lectures (2245)