Building log

11-Aug-2006
Beginning
Catégorie: Wings : Rear spar

Work begins on the rear spar. The doublers are those of the RV-8, they need to be trimmed, then they have to be sanded, on those thick parts there are a lot of shear marks on the edges.




Working time on this subpart
Today :  1h (Total : 1h)

Lectures (3657)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami