Building log

23-Jan-2009
Nosegear leg fairing
Catégorie: Finishing : Landing gear

After having riveted the piano hinge on the gear leg fairing, I installed it.
The hose clamp is holding the fairing and also the piano hinge pin.



Then I installed the nutplates on the main gear fairings, a lot of drilling, countersinking, deburring and riveting.




Working time on this subpart
Today :  2h (Total : 31h)

Lectures (2183)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami