Building log

15-Oct-2009
Magnetometers..3
Catégorie: Panel

I first begin by marking the wires (see the article about the method I use).
The learning curve was not that steep, some trial and error before getting an acceptable result.



I then installed a grommet on the rear bulkhead to pass all the wires through.
I also positionned the magnetometers so that they are perpendicular to the instrument panel.




Working time on this subpart
Today :  2h (Total : 17h)

Lectures (2565)
Précédent | Suivant
Page optimisée pour l'impression Envoyer ce blog à un ami