Building log - Articles les plus récents

Tout : Wings : Main spar
« 1 (2)


31-Jul-2006
Catégorie: Wings : Main spar

Working on the spar begins with the installation of nutplates for the fuel tanks. Each nutplate position needs three countersinks: two for the rivets and one for the screw. There are 150 nutplates.
The countersinking for the rivets goes very smoothly, fot the screw it's a bit different as the aluminium is not very thick, the pilot wanders on the other side. So I built a small jig with a steel bar and two rivets, it's visible on the picture and just held in position by a clamp.



The good depth of countersinking is reached when the outer diameter is 0,370 (+ or - 0,005) inches. I think I got his one right.




Working time on this subpart
Today :  4h (Total : 6h)

Lectures (3004)
29-Jul-2006
Catégorie: Wings : Main spar

With Guillaume we took the main spars out of storage. They look great and most important they are already assembled and primed. I just marked them so as they are used the right way. There still remains a lot to be done on these two parts.
I finished the day by continuing the workshop reorganization, I still have to build the new paint booth.




Working time on this subpart
Today :  2h (Total : 2h)

Lectures (2905)

« 1 (2)