Building log - Articles les plus récents

Tout : 
« 1 ... 71 72 73 (74) 75 76 77 ... 201 »


09-Jun-2009
Catégorie: Finishing : Landing gear

The wheel fairings got sanded and filled one more time.
I then riveted the outer bracket to the rear part of the fairing.



Then I installed all the nutplates on the inner bracket.




Working time on this subpart
Today :  2h (Total : 52h)

Lectures (2347)
09-Jun-2009
Catégorie: Engine : Cowls

Some sanding and filling to get a proper shape, mainly around the inlets.




Working time on this subpart
Today :  1h (Total : 112h)

Lectures (2203)
04-Jun-2009
Catégorie: Engine : Cowls

Due to the loss of an airplane I'm flying by my airline (Air France 447), I was not in the mood to go to the workshop.
Today I somehow managed to sand and fill for the second time the cowls.


Working time on this subpart
Today :  2h (Total : 111h)

Lectures (2840)
29-May-2009
Catégorie: Engine : Cowls

Work goes on with the sanding of the filling done the day before yesterday. Then I lay one layer of fiberglass on the upper inlet ramps.



And a little more filling on the inlet sides and the oil filler door.



In the next weeks, sanding and filling will be the main tasks as I have the cowls, the fairings and the canopy to finish.
Working time on this subpart
Today :  3h (Total : 109h)

Lectures (2297)
27-May-2009
Catégorie: Finishing : Landing gear

After some sanding, I lay one layer of fiberglass on the junction between the lower intersection fairing and the wheel fairing.




Working time on this subpart
Today :  1h (Total : 50h)

Lectures (2445)

« 1 ... 71 72 73 (74) 75 76 77 ... 201 »