Building log - Articles les plus récents |
![]() |
Tout : |
22-Sep-2008
|
Today,I begun fabricating the forward canopy fairing. First operation is to cut some fiberglass strips. The strips' width is increasing slowly between each layer and there will be 6 or 7 layers. The picture is taken after the second layer has been laid. The fiberglass is laid dry and the wetted with the black epoxy. Once all the layer are laid, the peel ply is applied. It will take out the excess epoxy and help sanding. The fiberglass is not really symetrical on both sides. I think some sanding or filling should take care of that. Working time on this subpart Today : 2h (Total : 110h) |
Lectures (2542)
22-Sep-2008
|
Lectures (2448)
21-Sep-2008
|
Lectures (2530)
17-Sep-2008
|
First I uninstall the canopy from the fuselage. This will allow easier working on the canopy fairing and also allow working in the fuselage while the epoxy is curing. Then I sand and fill the epoxy laid out yesterday to get I good looking curve between the skin and the canopy. Working time on this subpart Today : 2h (Total : 108h) |
Lectures (2481)
17-Sep-2008
|
I tested the "sandability" of the mixture applied yesterday and it seems easier to sand than the previous mixtures. So I applied some to the tips on the horizontal stabilizer and on the rudder. Working time on this subpart Today : 1h (Total : 34h) |
Lectures (2480)