14-Dec-2006
Catégorie: Fuselage

Today, the fuselage crates were delivered. They are in great shape, and we even had time to inventory the biggest of the crates. I'll finish it tomorrow.


Lectures (3724)
14-Dec-2006
Catégorie: Wings : Final assembly

Today, we finished riveting the upper skins. Sme care has to be taken with the rivet call out for the rear spar. Next step will be to install the ailerons and the flaps and all the pushrods.

Working time on this subpart
Today :  4h (Total : 16h)

Lectures (2803)
13-Dec-2006
Catégorie: Wings : Final assembly

Today, again wing skins riveting. The left wing is complete, on the right wing, six ribs to go.
Working time on this subpart
Today :  3h (Total : 15h)

Lectures (2807)
12-Dec-2006
Catégorie: Wings : Final assembly

Today, for the first time, my parents could visit the workshop. My dad volunteered to help buck the wingskin rivets. After some practice he did a great job. We only drilled out two rivets, the first one by being very picky to show him how it is done and the second one because I let slip the bucking bar, damageing the shophead.



After two hours, we only have some rivets to set on the outboard skin. The rivets on the rear spar and most inboard rib can be riveted solo as they are accessible with the squeezer.




Working time on this subpart
Today :  2h (Total : 12h)

Lectures (3374)
08-Dec-2006
Catégorie: Fuselage

The fuselage has landed in Roissy, it should be delivered on Tuesday 12th. Tomorrow I'll do some cleaning to make room for storing all the parts.
Lectures (3730)