Building log - Articles les plus récents |
![]() |
Tout : |
02-May-2006
Catégorie: Empennage : Hor. stab.
|
New problem, all holes are to be drilled to non metric sizes and the drill bits are chosen by number, letter or inches. Today I mixed up some drill bits and for sure the hole is now to big. Van's got me a solution so I don't have to buy a new half rear spar. Working time on this subpart Today : 2h (Total : 21h) |
Lectures (3180)
28-Apr-2006
Catégorie: Empennage : Hor. stab.
|
The replacement parts have arrived, and building resumed. I still have an egde distance issue but it's less critical than with the reinforcing angle. I surely have a problem with this spar. The second hole from the right is too near to the edge. We'll see that next time Van's answer : looks good to us, rivet on. Working time on this subpart Today : 3h (Total : 19h) |
Lectures (3167)
27-Apr-2006
Catégorie: Empennage : Vertical stab.
|
After I got Van's answer, I finished working on the vertical stab, only priming left. Working time on this subpart Today : 2h (Total : 11h) |
Lectures (4036)
27-Apr-2006
26-Apr-2006
Catégorie: Empennage : Vertical stab.
|
While waiting for Van's answer about my dimpling problem, I decided not to touch any cutting or drilling tool, but to prepare my first priming session. I got a thorough look at my painting gun, fabricated a small holder and a dedicated painting air hose. Then I sanded all the parts. At the end of the morning I got Alain's visit, he is building a RV-6 for a dozen years now. We spoke about my mishaps : all is normal. At the end of the afternoon (early morning in Oregon), I got Van's answer : clean it up to remove any rough areas, put a normal size rivet in the hole, and patch it with filler before you paint it. Cheap and easy. Working time on this subpart Today : 3h (Total : 9h) |
Lectures (3217)