28-May-2010
|
Before going on with the wiring, I tried to see the missing and umarked wires on the harnesses allready built. I fabricated the wires when possible. Some harnesses are still missing one or two wires and the intercom and stick hranesses are still to be done. I then finished and secured the main bus wire. It comes from the firewall (on the right), routes along the upper fuselage longeron going through the current sensor. Next stop is at the main bus. I then reinstalled the panel with GPS bracket, warning lights and mapbox. Working time on this subpart Today : 5h (Total : 105h) |
Lectures (2588)
27-May-2010
|
Still working on the wiring. I installed the resistors needed for the EIS fuel sensors, I also noticed that I have forgottent to run the wires for the fuel gages. I then installed the panel, I had some problems with one of the screws and after having solved that I saw that I had forgotten to slide in the map box so it will have to come off again. Working time on this subpart Today : 2h (Total : 100h) |
Lectures (2766)
26-May-2010
|
I made some wires, I could not find a suitable connector for the electric fuel pump. Another order to prepare. The picture shows the beginnng of the bus wiring, with the wires going from the buses to the diode. The "knotted" wires are fusible links. Working time on this subpart Today : 3h (Total : 98h) |
Lectures (2507)
25-May-2010
|
After having filled the small pinholes, the tips get a second coat of primer. Working time on this subpart Today : 2h (Total : 24h) |
Lectures (3256)