20-Nov-2010
19-Nov-2010
Catégorie: Fuselage : Forward fuselage
|
After a long interruption, Im' back in the workshop to try to finish the access panels. After some sanding, deburring and dimpling, I managed to prime all the parts. I will have to wait for tommorow for the assembly as the cold weather is slowing down the drying. I'm selling my Garmin 496, all informations HERE. If you are interested use this website's contact form in the left menu, you'll get a special price. Working time on this subpart Today : 2h (Total : 93h) |
Lectures (3408)
04-Nov-2010
Catégorie: Fuselage : Forward fuselage
|
As I have a few wires between the subpanel and the firewall that would be only accessible from under the panel, I decided to install two access panels on the forward skin. This modification is not on the plans but has been tested by a few builders. The access panel being thicker than the skin I have to install a shim between the skin and the reinforcing ring. The picture shows part of the shims. I then cut adn drill the reinforcing ring (square). The same from the other side. And with the panel installed. I still have to sand, prime and rivet. I also have to finish the second panel. Working time on this subpart Today : 6h (Total : 91h) |
Lectures (3093)
03-Nov-2010
|
I decided to change the GPS. Today, I installed the support bracket in the panel. It went smoothly as the new one has the same footprint has the old one. I also made all the connexions for the power, serial and audio. I tested some more the harnesses and found a problem on one of may warning lights that is wired per my drawing, but the drawing needs to be changed as it is not working as I intended. I will have to change one of the switches to get it right. Working time on this subpart Today : 2h (Total : 238h) |
Lectures (2693)
28-Oct-2010
|
I first tied down the antenna wires. Next week I will do the GPS antenna wires that got delayed due to a late hardware change. The wiring between the subpanel and the firewall is almost done. To be able to finish the panel installation I had some more small tasks to accomplish. For example the static and pitot tubing needed to get through the triangular bracket. I also installed the canopy jettison handle Working time on this subpart Today : 3h (Total : 236h) |