Building log - Articles les plus récents

Tout : 
« 1 ... 101 102 103 (104) 105 106 107 ... 201 »


30-Aug-2008
Catégorie: Empennage : Tip

This morning I adjusted and drilled the tips of the horizontal parts of the empennage. It may look like nothing but there was some work to be done: drilling, countersinking the fiberglass parts and dimpling the aluminium.




Then I cutout some small ribs in lght foam.




During the drilling, the aluminium strips bonded yesterday came of. So I had to glue them again (I think the better sequence is : drill the tips first, then drill the aluminium strips, then glue the strips).
I also glued the foam ribs and made a small repair on the empennage fairing (see the white peel ply strips).




Working time on this subpart
Today :  4h (Total : 16h)

Lectures (2297)
29-Aug-2008
Catégorie: Empennage : Tip

Still working on the tips. I first install some aluminium reinforcing strips along the flanges to avoid having the rivets tear through the fiberglass.




Then I reinstall all the empennage parts on the fuselage, this will allow to see the alignments and gaps between all the controls.
Before that I have to rivet the forward mount of the vertical stab. To be honest I had to do it twice as it was on the wrong side the first time.




Here all the parts are on the fuselage again.




Working time on this subpart
Today :  3h (Total : 12h)

Lectures (2301)
28-Aug-2008
Catégorie: Empennage : Tip

As I will shortly have to fabricate the front fairing of the canopy, I gain some experience with fiberglass and epoxy on smaller parts.
So I continue installing the tips on the rudder. We'll see the results tomorrow.




Working time on this subpart
Today :  1h (Total : 9h)

Lectures (2350)
28-Aug-2008
Catégorie: Fuselage : Cabin

The mapbox is riveted and then installed in the fuselage. This does not go without some problems as I have some problems reinstalling the subpanel. Using another sequence it goes better, but the fact that the left side is already riveted does not help.
I will also have to file a bit the opening in the subpanel. I also make two pilot holes in the panel, the other holes will be drilled later.




Working time on this subpart
Today :  2h (Total : 181h)

Lectures (2237)
28-Aug-2008
Catégorie: Finishing : Canopy

The day begins with the installtion of the canopy on the frame. The screws are tightened just enough to avoid cracking the plexiglas.
At the end of the day, I reinstall the canopy on the fuselage. The next operation will be to fabricate the seal and the fillet at the front.




Working time on this subpart
Today :  2h (Total : 123h)

Lectures (2358)

« 1 ... 101 102 103 (104) 105 106 107 ... 201 »