Building log - Articles les plus récents

Tout : 
« 1 ... 56 57 58 (59) 60 61 62 ... 201 »


01-Oct-2009
Catégorie: Empennage : Tip

Today should be a sunny day, and as all the painting stuff is out, I will apply a coat of primer on the empennage tips.
All teh aprts got taken out of storage, cleaned and lightly sanded. Tomorrow I'll spray them after some masking.


Working time on this subpart
Today :  1h (Total : 62h)

Lectures (3412)
30-Sep-2009
Catégorie: Propeller

Some more work on the spinner gap fillers. I drill the small bracket and the drill the assmbly to the rear spinner plate.
I then drill the hole for the screw.
All the holes have been drilled undersize as I want to recheck the spinner position before drilling to final size.



These are the two gap fillers. And I have a small problem, the holes not far enough from the edges to install the nutplate. I will use the hole for one of the nutplate's rivet and drill a new hole for the screw. And the hole in the spinner will have to be filled.




Working time on this subpart
Today :  1h (Total : 7h)

Lectures (2785)
30-Sep-2009
Catégorie: Engine : Cowls

After some sanding and very small filling, both haf-cowls got a final primer coat. The result is decent but there will be some work before final paint.




Working time on this subpart
Today :  3h (Total : 147h)

Lectures (3270)
29-Sep-2009
Catégorie: Propeller

As the spinner has been cut out for the propeller blades, a small gap filler has to be fabricated to fill the gap behind the blade. The picture shows the gap filler in position.



On the longer side of the filler, a small bracket will be riveted that will also hold a nutplate so that the spinner can be screwed to the bracket.




Working time on this subpart
Today :  1h (Total : 6h)

Lectures (2626)
29-Sep-2009
Catégorie: Finishing : Landing gear

The last two gear fairng parts got primed.




Working time on this subpart
Today :  1h (Total : 96h)

Lectures (2618)

« 1 ... 56 57 58 (59) 60 61 62 ... 201 »