Building log - Articles les plus récents |
![]() |
Tout : |
15-Jan-2008
|
The session begins with the sanding of the remaining parts : forward skin and panel structure. Then I installed the two fresh air scoops. They will be prosealed to the skin but I decided to use a few rivets to hold the scoop while the proseal is setting. To avoid braking the scoop during riveting, I fabricated a one piece shim with some leftover aluminium sheet. It didn't take to long and looks nice. Working time on this subpart Today : 2h (Total : 111h) |
Lectures (2538)
10-Jan-2008
|
Lectures (2415)
10-Jan-2008
09-Jan-2008
|
Lectures (2707)
03-Jan-2008
|
No workshop time today as I caught a cold. I used the time to redo the trim wiring diagram. On VansAirforce there was a group buy for the new TCW Technologies Safety Trim system. I tink it will allow a safer operation of the trims, stoppong them if they are running to long and allowing some control in case they are stuck. It will also mix the inputs from both sticks without having to install relays. The schematics are available HERE |
Lectures (2893)